CPT code 76125: Cine/video X-ray, add-on service2026 Medicare rate & RVUs in Colorado
Reports cine/video X-ray imaging as an add-on to its primary procedure, with professional interpretation and technical equipment-and-staff portions.
CMS doesn’t publish a rate for 76125 in Colorado.
Check a contract rate as a % of Medicare · 76125 nationwide
Medicare allowed amount for participating (non-QP) physicians, before deductible, coinsurance and claim adjustments. Not a patient’s bill or a hospital charge.
On this page 11 sections
What 76125 covers
76125 is an add-on service for cine/video X-ray imaging and is reported with its corresponding primary procedure. Cine/video imaging records moving X-ray images. The diagnostic test has a professional portion for physician interpretation and a technical portion for imaging equipment and staff. The interpreting physician reports the professional portion, while the entity furnishing the imaging equipment and staff reports the technical portion.
Medicare assigns status C: CMS publishes no national payment amount, and the Medicare Administrative Contractor prices each claim. As an add-on, 76125 is billed only with its primary procedure, and its payment falls within that procedure's global period. Modifier 26 identifies the professional interpretation; modifier TC identifies the technical equipment-and-staff portion. Reporting the code without either modifier represents the global service.
This summary was written with AI assistance from CMS physician fee schedule data and checked against the CMS billing rules shown here. Rates on this page come directly from CMS files.
How Colorado compares for 76125
- Colorado · this pageUnavailable
- Los Angeles, CA · CaliforniaUnavailable
- Washington, DC area · District of ColumbiaUnavailable
- Miami, FL · FloridaUnavailable
- Chicago, IL · IllinoisUnavailable
- Manhattan, NY · New YorkUnavailable
- Alaska · AlaskaUnavailable
Other areas in Colorado first, then benchmark localities. Bars start at $0.
Every other payment area
76125 rates by state
Office rate range in each state. Select a state to see its payment localities.
Explore a state
Local rates. Clear comparisons.
Hover or focus a tile to see its rate range. Select it to open the state’s fee schedule.
View every state and territory as a table
| State / territory | Office rate range | Localities |
|---|---|---|
| AK | No published base rate | 1 |
| AL | No published base rate | 1 |
| AR | No published base rate | 1 |
| AZ | No published base rate | 1 |
| CA | No published base rate | 29 |
| CO | No published base rate | 1 |
| CT | No published base rate | 1 |
| DC | No published base rate | 1 |
| DE | No published base rate | 1 |
| FL | No published base rate | 3 |
| GA | No published base rate | 2 |
| GU | No published base rate | 1 |
| HI | No published base rate | 1 |
| IA | No published base rate | 1 |
| ID | No published base rate | 1 |
| IL | No published base rate | 4 |
| IN | No published base rate | 1 |
| KS | No published base rate | 1 |
| KY | No published base rate | 1 |
| LA | No published base rate | 2 |
| MA | No published base rate | 2 |
| MD | No published base rate | 3 |
| ME | No published base rate | 2 |
| MI | No published base rate | 2 |
| MN | No published base rate | 1 |
| MO | No published base rate | 3 |
| MS | No published base rate | 1 |
| MT | No published base rate | 1 |
| NC | No published base rate | 1 |
| ND | No published base rate | 1 |
| NE | No published base rate | 1 |
| NH | No published base rate | 1 |
| NJ | No published base rate | 2 |
| NM | No published base rate | 1 |
| NV | No published base rate | 1 |
| NY | No published base rate | 5 |
| OH | No published base rate | 1 |
| OK | No published base rate | 1 |
| OR | No published base rate | 2 |
| PA | No published base rate | 2 |
| PR | No published base rate | 1 |
| RI | No published base rate | 1 |
| SC | No published base rate | 1 |
| SD | No published base rate | 1 |
| TN | No published base rate | 1 |
| TX | No published base rate | 8 |
| UT | No published base rate | 1 |
| VA | No published base rate | 2 |
| VI | No published base rate | 1 |
| VT | No published base rate | 1 |
| WA | No published base rate | 2 |
| WI | No published base rate | 1 |
| WV | No published base rate | 1 |
| WY | No published base rate | 1 |
How the 76125 rate is calculated
Each of 76125’s three RVUs is multiplied by a geographic index (GPCI) for the payment locality, added up, and multiplied by the conversion factor. Drag the indexes or enter a ZIP to see what moves the rate.
How the rate is built · 76125
RVUs × geographic indexes × conversion factor
Work0.00
0.00 RVUs× 1.000 GPCI
Practice expense0.00
0.00 RVUs× 1.000 GPCI
Malpractice0.00
0.00 RVUs× 1.000 GPCI
Adjusted RVUs
0.0000
Conversion factor
$33.4009
Medicare rate
$0.00
Every GPCI starts at 1.000, the national rate. Enter a ZIP or drag a slider.
Payment rules and modifiers for 76125
The CMS indicators that decide how 76125 is paid alongside other services.
CMS payment indicators · 76125
Cine/video X-ray, add-on service
| Rule | CMS value | What it means |
|---|---|---|
| Global period | ZZZ | Add-on code: falls within the primary procedure’s global period. |
| Multiple procedures | 0 | No multiple-procedure reduction. |
| Bilateral (modifier 50) | 0 | The 150% bilateral adjustment doesn’t apply. |
| Assistant at surgery (80/81/82/AS) | 0 | Not paid without supporting documentation. |
| Co-surgeons (62) | 0 | Not permitted. |
| Team surgery (66) | 0 | Not permitted. |
| Professional/technical | 1 | Diagnostic test with separate professional (26) and technical (TC) components. |
What modifiers do to the payment
Modifier 26 · payment effect
With and without the modifier
76125 without 26 · national facility
$0.00
Cine/video X-ray, add-on service
76125-26 · Professional component
$14.03
Pays only the interpretation and report.
How 76125 has changed in Colorado
76125 · Office / nonfacility
Rate unavailable
Effective 2026-10-01
A rate is unavailable in one of these releases, so a change cannot be calculated.
One bar per available release, ordered by effective date. Missing rates remain gaps. These comparisons hold the code, setting and locality identifiers constant; they do not isolate which policy or input caused a change.
What changed, release by release
| Effective from | Office | Facility | CMS release |
|---|---|---|---|
| 2026-10-01 | Contractor-priced | Contractor-priced | RVU26D |
| 2026-07-01 | Contractor-priced | Contractor-priced | RVU26C |
| 2026-04-01 | Contractor-priced | Contractor-priced | RVU26B |
| 2026-01-01 | Contractor-priced | Contractor-priced | RVU26A |
| 2025-10-01 | Contractor-priced | Contractor-priced | RVU25D |
| 2025-07-01 | Contractor-priced | Contractor-priced | RVU25C |
| 2025-04-01 | Contractor-priced | Contractor-priced | RVU25B |
| 2025-01-01 | Contractor-priced | Contractor-priced | RVU25A |
| 2024-10-01 | Contractor-priced | Contractor-priced | RVU24D |
| 2024-07-01 | Contractor-priced | Contractor-priced | RVU24C |
| 2024-04-01 | Contractor-priced | Contractor-priced | RVU24B |
| 2024-03-09 | Contractor-priced | Contractor-priced | RVU24AR |
| 2024-01-01 | Contractor-priced | Contractor-priced | RVU24A |
| 2023-10-01 | Contractor-priced | Contractor-priced | RVU23D |
| 2023-07-01 | Contractor-priced | Contractor-priced | RVU23C |
| 2023-04-01 | Contractor-priced | Contractor-priced | RVU23B |
| 2023-01-01 | Contractor-priced | Contractor-priced | RVU23A |
| 2022-10-01 | Contractor-priced | Contractor-priced | RVU22D |
| 2022-07-01 | Contractor-priced | Contractor-priced | RVU22C |
| 2022-04-01 | Contractor-priced | Contractor-priced | RVU22B |
| 2022-01-01 | Contractor-priced | Contractor-priced | RVU22A |
| 2021-10-01 | Contractor-priced | Contractor-priced | RVU21D |
| 2021-07-01 | Contractor-priced | Contractor-priced | RVU21C |
| 2021-04-01 | Contractor-priced | Contractor-priced | RVU21B |
| 2021-01-01 | Contractor-priced | Contractor-priced | RVU21A |
| 2020-10-01 | Contractor-priced | Contractor-priced | RVU20D |
| 2020-07-01 | Contractor-priced | Contractor-priced | RVU20C |
| 2020-04-01 | Contractor-priced | Contractor-priced | RVU20B |
| 2020-01-01 | Contractor-priced | Contractor-priced | RVU20A |
| 2019-10-01 | Contractor-priced | Contractor-priced | RVU19D |
| 2019-07-01 | Contractor-priced | Contractor-priced | RVU19C |
| 2019-04-01 | Contractor-priced | Contractor-priced | RVU19B |
| 2019-01-01 | Contractor-priced | Contractor-priced | RVU19A |
| 2018-10-01 | Contractor-priced | Contractor-priced | RVU18D |
| 2018-07-01 | Contractor-priced | Contractor-priced | RVU18C |
| 2018-04-01 | Contractor-priced | Contractor-priced | RVU18B |
| 2018-01-01 | Contractor-priced | Contractor-priced | RVU18AR1 |
| 2017-10-01 | Contractor-priced | Contractor-priced | RVU17D |
| 2017-07-01 | Contractor-priced | Contractor-priced | RVU17C |
| 2017-04-01 | Contractor-priced | Contractor-priced | RVU17B |
| 2017-01-01 | Contractor-priced | Contractor-priced | RVU17A |
| 2016-10-01 | Contractor-priced | Contractor-priced | RVU16D |
| 2016-07-01 | Contractor-priced | Contractor-priced | RVU16C |
| 2016-04-01 | Contractor-priced | Contractor-priced | RVU16B |
| 2016-01-01 | Contractor-priced | Contractor-priced | RVU16A |
| 2015-10-01 | Contractor-priced | Contractor-priced | RVU15D |
| 2015-07-01 | Contractor-priced | Contractor-priced | RVU15C |
| 2015-04-01 | Contractor-priced | Contractor-priced | RVU15B |
| 2015-01-01 | Contractor-priced | Contractor-priced | RVU15A |
| 2014-10-01 | Contractor-priced | Contractor-priced | RVU14D |
| 2014-07-01 | Contractor-priced | Contractor-priced | RVU14C |
| 2014-04-01 | Contractor-priced | Contractor-priced | RVU14B |
| 2014-01-01 | Contractor-priced | Contractor-priced | RVU14A |
| 2013-10-01 | Contractor-priced | Contractor-priced | RVU13D |
| 2013-07-01 | Contractor-priced | Contractor-priced | RVU13C |
| 2013-04-01 | Contractor-priced | Contractor-priced | RVU13B |
| 2013-01-01 | Contractor-priced | Contractor-priced | RVU13AR |
Where the Colorado rate applies
Colorado is a Medicare payment area, not a city. Our Census mapping connects it to 485 cities and communities in Colorado. Some span more than one payment area; confirm with the service ZIP.
- Acres Green
- Aetna Estates
- Aguilar
- Air Force Academy
- Akron
- Alamosa
- Alamosa East
- Allenspark
76125 billing questions
How does 76125 differ from 76120?
76120 is the primary cine/video X-ray service. 76125 is an add-on and must be reported with its primary procedure.
Can 76125 be billed by itself?
No. It is an add-on code and must be reported with its primary procedure.
Which modifiers identify the professional and technical portions?
Modifier 26 identifies the professional interpretation, and modifier TC identifies the technical equipment-and-staff portion. Without either modifier, the service represents the global service.
How does Medicare price 76125?
Status C means CMS publishes no national payment amount; the Medicare Administrative Contractor prices each claim. Payment falls within the primary procedure's global period.
Where these rates come from
FeeBase calculates base physician payments from CMS work, practice-expense and malpractice RVUs, adjusted by each locality’s geographic indexes and the conversion factor. Services without a published rate are labeled, never given a made-up amount. Amounts are Medicare allowed amounts before claim adjustments: not a patient’s bill or a commercial rate.
CMS RVU26D · effective Oct 1, 2026 through the day before Jan 1, 2027
Fee sheets · Coming soon
Put 76125 and the rest of your codes on one sheet
Your codes at your locality, with payer contracts beside Medicare.
Join the waitlist