CPT code 78429: Cardiac PET, single metabolic study with CT2026 Medicare rate & RVUs in Arkansas
A single-study cardiac PET metabolic examination with CT supports myocardial evaluation, including assessment of viability in ischemic heart disease.
CMS doesn’t publish a rate for 78429 in Arkansas.
Check a contract rate as a % of Medicare · 78429 nationwide
Medicare allowed amount for participating (non-QP) physicians, before deductible, coinsurance and claim adjustments. Not a patient’s bill or a hospital charge.
On this page 11 sections
What 78429 covers
This service is a cardiac PET examination that evaluates myocardial metabolism in one study, with a concurrently acquired CT transmission scan for attenuation correction and anatomical localization. It may be used to assess myocardial viability, including in patients with ischemic left ventricular dysfunction. Nuclear medicine and cardiology practices and hospital imaging departments may provide the technical service, while a qualified physician interprets the images.
Medicare assigns this CPT code carrier-priced status: CMS publishes no national payment, and the Medicare Administrative Contractor sets payment for each claim. Modifier 26 identifies the physician’s interpretation, and modifier TC identifies the equipment and staff portion. Reporting without either modifier represents the global service. Choose a different code when the examination evaluates perfusion or uses a different study protocol.
This summary was written with AI assistance from CMS physician fee schedule data and checked against the CMS billing rules shown here. Rates on this page come directly from CMS files.
How Arkansas compares for 78429
- Arkansas · this pageUnavailable
- Los Angeles, CA · CaliforniaUnavailable
- Washington, DC area · District of ColumbiaUnavailable
- Miami, FL · FloridaUnavailable
- Chicago, IL · IllinoisUnavailable
- Manhattan, NY · New YorkUnavailable
- Alaska · AlaskaUnavailable
Other areas in Arkansas first, then benchmark localities. Bars start at $0.
Every other payment area
78429 rates by state
Office rate range in each state. Select a state to see its payment localities.
Explore a state
Local rates. Clear comparisons.
Hover or focus a tile to see its rate range. Select it to open the state’s fee schedule.
View every state and territory as a table
| State / territory | Office rate range | Localities |
|---|---|---|
| AK | No published base rate | 1 |
| AL | No published base rate | 1 |
| AR | No published base rate | 1 |
| AZ | No published base rate | 1 |
| CA | No published base rate | 29 |
| CO | No published base rate | 1 |
| CT | No published base rate | 1 |
| DC | No published base rate | 1 |
| DE | No published base rate | 1 |
| FL | No published base rate | 3 |
| GA | No published base rate | 2 |
| GU | No published base rate | 1 |
| HI | No published base rate | 1 |
| IA | No published base rate | 1 |
| ID | No published base rate | 1 |
| IL | No published base rate | 4 |
| IN | No published base rate | 1 |
| KS | No published base rate | 1 |
| KY | No published base rate | 1 |
| LA | No published base rate | 2 |
| MA | No published base rate | 2 |
| MD | No published base rate | 3 |
| ME | No published base rate | 2 |
| MI | No published base rate | 2 |
| MN | No published base rate | 1 |
| MO | No published base rate | 3 |
| MS | No published base rate | 1 |
| MT | No published base rate | 1 |
| NC | No published base rate | 1 |
| ND | No published base rate | 1 |
| NE | No published base rate | 1 |
| NH | No published base rate | 1 |
| NJ | No published base rate | 2 |
| NM | No published base rate | 1 |
| NV | No published base rate | 1 |
| NY | No published base rate | 5 |
| OH | No published base rate | 1 |
| OK | No published base rate | 1 |
| OR | No published base rate | 2 |
| PA | No published base rate | 2 |
| PR | No published base rate | 1 |
| RI | No published base rate | 1 |
| SC | No published base rate | 1 |
| SD | No published base rate | 1 |
| TN | No published base rate | 1 |
| TX | No published base rate | 8 |
| UT | No published base rate | 1 |
| VA | No published base rate | 2 |
| VI | No published base rate | 1 |
| VT | No published base rate | 1 |
| WA | No published base rate | 2 |
| WI | No published base rate | 1 |
| WV | No published base rate | 1 |
| WY | No published base rate | 1 |
How the 78429 rate is calculated
Each of 78429’s three RVUs is multiplied by a geographic index (GPCI) for the payment locality, added up, and multiplied by the conversion factor. Drag the indexes or enter a ZIP to see what moves the rate.
How the rate is built · 78429
RVUs × geographic indexes × conversion factor
Work0.00
0.00 RVUs× 1.000 GPCI
Practice expense0.00
0.00 RVUs× 1.000 GPCI
Malpractice0.00
0.00 RVUs× 1.000 GPCI
Adjusted RVUs
0.0000
Conversion factor
$33.4009
Medicare rate
$0.00
Every GPCI starts at 1.000, the national rate. Enter a ZIP or drag a slider.
Payment rules and modifiers for 78429
The CMS indicators that decide how 78429 is paid alongside other services.
CMS payment indicators · 78429
Cardiac PET, single metabolic study with CT
| Rule | CMS value | What it means |
|---|---|---|
| Global period | XXX | The global surgery concept doesn’t apply. |
| Multiple procedures | 0 | No multiple-procedure reduction. |
| Bilateral (modifier 50) | 0 | The 150% bilateral adjustment doesn’t apply. |
| Assistant at surgery (80/81/82/AS) | 0 | Not paid without supporting documentation. |
| Co-surgeons (62) | 0 | Not permitted. |
| Team surgery (66) | 0 | Not permitted. |
| Professional/technical | 1 | Diagnostic test with separate professional (26) and technical (TC) components. |
What modifiers do to the payment
Modifier 26 · payment effect
With and without the modifier
78429 without 26 · national facility
$0.00
Cardiac PET, single metabolic study with CT
78429-26 · Professional component
$77.82
Pays only the interpretation and report.
How 78429 has changed in Arkansas
78429 · Office / nonfacility
Rate unavailable
Effective 2026-10-01
A rate is unavailable in one of these releases, so a change cannot be calculated.
One bar per available release, ordered by effective date. Missing rates remain gaps. These comparisons hold the code, setting and locality identifiers constant; they do not isolate which policy or input caused a change.
What changed, release by release
January 1, 2020
RVU20A
No ratechanged toNo rate
Held through RVU20B, RVU20C, RVU20D, RVU21A, RVU21B, RVU21C, RVU21D, RVU22A, RVU22B, RVU22C, RVU22D, RVU23A, RVU23B, RVU23C, RVU23D, RVU24A, RVU24AR, RVU24B, RVU24C, RVU24D, RVU25A, RVU25B, RVU25C, RVU25D, RVU26A, RVU26B, RVU26C, RVU26D.
January 1, 2013
RVU13AR
Earliest loaded release: No rate
Held through RVU13B, RVU13C, RVU13D, RVU14A, RVU14B, RVU14C, RVU14D, RVU15A, RVU15B, RVU15C, RVU15D, RVU16A, RVU16B, RVU16C, RVU16D, RVU17A, RVU17B, RVU17C, RVU17D, RVU18AR1, RVU18B, RVU18C, RVU18D, RVU19A, RVU19B, RVU19C, RVU19D.
| Effective from | Office | Facility | CMS release |
|---|---|---|---|
| 2026-10-01 | Contractor-priced | Contractor-priced | RVU26D |
| 2026-07-01 | Contractor-priced | Contractor-priced | RVU26C |
| 2026-04-01 | Contractor-priced | Contractor-priced | RVU26B |
| 2026-01-01 | Contractor-priced | Contractor-priced | RVU26A |
| 2025-10-01 | Contractor-priced | Contractor-priced | RVU25D |
| 2025-07-01 | Contractor-priced | Contractor-priced | RVU25C |
| 2025-04-01 | Contractor-priced | Contractor-priced | RVU25B |
| 2025-01-01 | Contractor-priced | Contractor-priced | RVU25A |
| 2024-10-01 | Contractor-priced | Contractor-priced | RVU24D |
| 2024-07-01 | Contractor-priced | Contractor-priced | RVU24C |
| 2024-04-01 | Contractor-priced | Contractor-priced | RVU24B |
| 2024-03-09 | Contractor-priced | Contractor-priced | RVU24AR |
| 2024-01-01 | Contractor-priced | Contractor-priced | RVU24A |
| 2023-10-01 | Contractor-priced | Contractor-priced | RVU23D |
| 2023-07-01 | Contractor-priced | Contractor-priced | RVU23C |
| 2023-04-01 | Contractor-priced | Contractor-priced | RVU23B |
| 2023-01-01 | Contractor-priced | Contractor-priced | RVU23A |
| 2022-10-01 | Contractor-priced | Contractor-priced | RVU22D |
| 2022-07-01 | Contractor-priced | Contractor-priced | RVU22C |
| 2022-04-01 | Contractor-priced | Contractor-priced | RVU22B |
| 2022-01-01 | Contractor-priced | Contractor-priced | RVU22A |
| 2021-10-01 | Contractor-priced | Contractor-priced | RVU21D |
| 2021-07-01 | Contractor-priced | Contractor-priced | RVU21C |
| 2021-04-01 | Contractor-priced | Contractor-priced | RVU21B |
| 2021-01-01 | Contractor-priced | Contractor-priced | RVU21A |
| 2020-10-01 | Contractor-priced | Contractor-priced | RVU20D |
| 2020-07-01 | Contractor-priced | Contractor-priced | RVU20C |
| 2020-04-01 | Contractor-priced | Contractor-priced | RVU20B |
| 2020-01-01 | Contractor-priced | Contractor-priced | RVU20A |
| 2019-10-01 | Not in this release | Not in this release | RVU19D |
| 2019-07-01 | Not in this release | Not in this release | RVU19C |
| 2019-04-01 | Not in this release | Not in this release | RVU19B |
| 2019-01-01 | Not in this release | Not in this release | RVU19A |
| 2018-10-01 | Not in this release | Not in this release | RVU18D |
| 2018-07-01 | Not in this release | Not in this release | RVU18C |
| 2018-04-01 | Not in this release | Not in this release | RVU18B |
| 2018-01-01 | Not in this release | Not in this release | RVU18AR1 |
| 2017-10-01 | Not in this release | Not in this release | RVU17D |
| 2017-07-01 | Not in this release | Not in this release | RVU17C |
| 2017-04-01 | Not in this release | Not in this release | RVU17B |
| 2017-01-01 | Not in this release | Not in this release | RVU17A |
| 2016-10-01 | Not in this release | Not in this release | RVU16D |
| 2016-07-01 | Not in this release | Not in this release | RVU16C |
| 2016-04-01 | Not in this release | Not in this release | RVU16B |
| 2016-01-01 | Not in this release | Not in this release | RVU16A |
| 2015-10-01 | Not in this release | Not in this release | RVU15D |
| 2015-07-01 | Not in this release | Not in this release | RVU15C |
| 2015-04-01 | Not in this release | Not in this release | RVU15B |
| 2015-01-01 | Not in this release | Not in this release | RVU15A |
| 2014-10-01 | Not in this release | Not in this release | RVU14D |
| 2014-07-01 | Not in this release | Not in this release | RVU14C |
| 2014-04-01 | Not in this release | Not in this release | RVU14B |
| 2014-01-01 | Not in this release | Not in this release | RVU14A |
| 2013-10-01 | Not in this release | Not in this release | RVU13D |
| 2013-07-01 | Not in this release | Not in this release | RVU13C |
| 2013-04-01 | Not in this release | Not in this release | RVU13B |
| 2013-01-01 | Not in this release | Not in this release | RVU13AR |
Where the Arkansas rate applies
Arkansas is a Medicare payment area, not a city. Our Census mapping connects it to 626 cities and communities in Arkansas. Some span more than one payment area; confirm with the service ZIP.
- Acorn
- Adona
- Alexander
- Alicia
- Alix
- Alleene
- Allport
- Alma
78429 billing questions
When should 78429 be selected instead of 78430?
Use 78429 for a single PET study evaluating myocardial metabolism with CT. Code 78430 describes a single cardiac PET perfusion study with CT.
How does 78429 differ from 78433?
78429 describes a single metabolic PET study with CT. Code 78433 is the two-radiotracer cardiac PET code with CT.
Can the professional and technical portions be reported separately?
Yes. Modifier 26 identifies the interpretation, and modifier TC identifies the equipment and staff portion. Without either modifier, the claim represents the global service.
What does Medicare's carrier-priced status mean for 78429?
CMS publishes no national payment for this code. The Medicare Administrative Contractor sets payment for each claim.
What should the record support when reporting 78429?
The record should support a single cardiac PET metabolic study with a concurrently acquired CT transmission scan. The code is distinct from cardiac PET perfusion imaging.
Where these rates come from
FeeBase calculates base physician payments from CMS work, practice-expense and malpractice RVUs, adjusted by each locality’s geographic indexes and the conversion factor. Services without a published rate are labeled, never given a made-up amount. Amounts are Medicare allowed amounts before claim adjustments: not a patient’s bill or a commercial rate.
CMS RVU26D · effective Oct 1, 2026 through the day before Jan 1, 2027
Fee sheets
Put 78429 and the rest of your codes on one sheet
Your codes at your locality, with payer contracts beside Medicare.
Build my fee sheet