HCPCS code R0075: Portable X-ray transport, multiple patients2026 Medicare rate & RVUs in Wisconsin
Reports a portable X-ray equipment and personnel trip to a home or nursing home when more than one patient is seen at that location.
CMS doesn’t publish a rate for R0075 in Wisconsin.
Check a contract rate as a % of Medicare · R0075 nationwide
Medicare allowed amount for participating (non-QP) physicians, before deductible, coinsurance and claim adjustments. Not a patient’s bill or a hospital charge.
On this page 11 sections
What R0075 covers
R0075 identifies transportation of portable X-ray equipment and personnel to a home or nursing home for a trip on which more than one patient is seen. The code describes the trip to the facility or location, rather than a separate transportation charge for each patient. A separate code covers interpretation.
Medicare assigns R0075 physician fee schedule status C, or carrier priced: CMS publishes no national payment, and the Medicare Administrative Contractor sets payment for each claim. The HCPCS pricing method directs the contractor to price the code under the physician fee schedule. Special Medicare coverage instructions apply. Report the code per trip when more than one patient is seen; the code selection is based on that distinction, not on the number of patients beyond it.
This summary was written with AI assistance from CMS physician fee schedule data and checked against the CMS billing rules shown here. Rates on this page come directly from CMS files.
How Wisconsin compares for R0075
- Wisconsin · this pageUnavailable
- Los Angeles, CA · CaliforniaUnavailable
- Washington, DC area · District of ColumbiaUnavailable
- Miami, FL · FloridaUnavailable
- Chicago, IL · IllinoisUnavailable
- Manhattan, NY · New YorkUnavailable
- Alaska · AlaskaUnavailable
Other areas in Wisconsin first, then benchmark localities. Bars start at $0.
Every other payment area
R0075 rates by state
Office rate range in each state. Select a state to see its payment localities.
Explore a state
Local rates. Clear comparisons.
Hover or focus a tile to see its rate range. Select it to open the state’s fee schedule.
View every state and territory as a table
| State / territory | Office rate range | Localities |
|---|---|---|
| AK | No published base rate | 1 |
| AL | No published base rate | 1 |
| AR | No published base rate | 1 |
| AZ | No published base rate | 1 |
| CA | No published base rate | 29 |
| CO | No published base rate | 1 |
| CT | No published base rate | 1 |
| DC | No published base rate | 1 |
| DE | No published base rate | 1 |
| FL | No published base rate | 3 |
| GA | No published base rate | 2 |
| GU | No published base rate | 1 |
| HI | No published base rate | 1 |
| IA | No published base rate | 1 |
| ID | No published base rate | 1 |
| IL | No published base rate | 4 |
| IN | No published base rate | 1 |
| KS | No published base rate | 1 |
| KY | No published base rate | 1 |
| LA | No published base rate | 2 |
| MA | No published base rate | 2 |
| MD | No published base rate | 3 |
| ME | No published base rate | 2 |
| MI | No published base rate | 2 |
| MN | No published base rate | 1 |
| MO | No published base rate | 3 |
| MS | No published base rate | 1 |
| MT | No published base rate | 1 |
| NC | No published base rate | 1 |
| ND | No published base rate | 1 |
| NE | No published base rate | 1 |
| NH | No published base rate | 1 |
| NJ | No published base rate | 2 |
| NM | No published base rate | 1 |
| NV | No published base rate | 1 |
| NY | No published base rate | 5 |
| OH | No published base rate | 1 |
| OK | No published base rate | 1 |
| OR | No published base rate | 2 |
| PA | No published base rate | 2 |
| PR | No published base rate | 1 |
| RI | No published base rate | 1 |
| SC | No published base rate | 1 |
| SD | No published base rate | 1 |
| TN | No published base rate | 1 |
| TX | No published base rate | 8 |
| UT | No published base rate | 1 |
| VA | No published base rate | 2 |
| VI | No published base rate | 1 |
| VT | No published base rate | 1 |
| WA | No published base rate | 2 |
| WI | No published base rate | 1 |
| WV | No published base rate | 1 |
| WY | No published base rate | 1 |
How the R0075 rate is calculated
Each of R0075’s three RVUs is multiplied by a geographic index (GPCI) for the payment locality, added up, and multiplied by the conversion factor. Drag the indexes or enter a ZIP to see what moves the rate.
How the rate is built · R0075
RVUs × geographic indexes × conversion factor
Work0.00
0.00 RVUs× 1.000 GPCI
Practice expense0.00
0.00 RVUs× 1.000 GPCI
Malpractice0.00
0.00 RVUs× 1.000 GPCI
Adjusted RVUs
0.0000
Conversion factor
$33.4009
Medicare rate
$0.00
Every GPCI starts at 1.000, the national rate. Enter a ZIP or drag a slider.
Payment rules and modifiers for R0075
The CMS indicators that decide how R0075 is paid alongside other services.
CMS payment indicators · R0075
Portable X-ray transport, multiple patients
| Rule | CMS value | What it means |
|---|---|---|
| Global period | XXX | The global surgery concept doesn’t apply. |
| Multiple procedures | 0 | No multiple-procedure reduction. |
| Bilateral (modifier 50) | 0 | The 150% bilateral adjustment doesn’t apply. |
| Assistant at surgery (80/81/82/AS) | 0 | Not paid without supporting documentation. |
| Co-surgeons (62) | 0 | Not permitted. |
| Team surgery (66) | 0 | Not permitted. |
| Professional/technical | 3 | Technical component only. |
How R0075 has changed in Wisconsin
R0075 · Office / nonfacility
Rate unavailable
Effective 2026-10-01
A rate is unavailable in one of these releases, so a change cannot be calculated.
One bar per available release, ordered by effective date. Missing rates remain gaps. These comparisons hold the code, setting and locality identifiers constant; they do not isolate which policy or input caused a change.
What changed, release by release
| Effective from | Office | Facility | CMS release |
|---|---|---|---|
| 2026-10-01 | Contractor-priced | Contractor-priced | RVU26D |
| 2026-07-01 | Contractor-priced | Contractor-priced | RVU26C |
| 2026-04-01 | Contractor-priced | Contractor-priced | RVU26B |
| 2026-01-01 | Contractor-priced | Contractor-priced | RVU26A |
| 2025-10-01 | Contractor-priced | Contractor-priced | RVU25D |
| 2025-07-01 | Contractor-priced | Contractor-priced | RVU25C |
| 2025-04-01 | Contractor-priced | Contractor-priced | RVU25B |
| 2025-01-01 | Contractor-priced | Contractor-priced | RVU25A |
| 2024-10-01 | Contractor-priced | Contractor-priced | RVU24D |
| 2024-07-01 | Contractor-priced | Contractor-priced | RVU24C |
| 2024-04-01 | Contractor-priced | Contractor-priced | RVU24B |
| 2024-03-09 | Contractor-priced | Contractor-priced | RVU24AR |
| 2024-01-01 | Contractor-priced | Contractor-priced | RVU24A |
| 2023-10-01 | Contractor-priced | Contractor-priced | RVU23D |
| 2023-07-01 | Contractor-priced | Contractor-priced | RVU23C |
| 2023-04-01 | Contractor-priced | Contractor-priced | RVU23B |
| 2023-01-01 | Contractor-priced | Contractor-priced | RVU23A |
| 2022-10-01 | Contractor-priced | Contractor-priced | RVU22D |
| 2022-07-01 | Contractor-priced | Contractor-priced | RVU22C |
| 2022-04-01 | Contractor-priced | Contractor-priced | RVU22B |
| 2022-01-01 | Contractor-priced | Contractor-priced | RVU22A |
| 2021-10-01 | Contractor-priced | Contractor-priced | RVU21D |
| 2021-07-01 | Contractor-priced | Contractor-priced | RVU21C |
| 2021-04-01 | Contractor-priced | Contractor-priced | RVU21B |
| 2021-01-01 | Contractor-priced | Contractor-priced | RVU21A |
| 2020-10-01 | Contractor-priced | Contractor-priced | RVU20D |
| 2020-07-01 | Contractor-priced | Contractor-priced | RVU20C |
| 2020-04-01 | Contractor-priced | Contractor-priced | RVU20B |
| 2020-01-01 | Contractor-priced | Contractor-priced | RVU20A |
| 2019-10-01 | Contractor-priced | Contractor-priced | RVU19D |
| 2019-07-01 | Contractor-priced | Contractor-priced | RVU19C |
| 2019-04-01 | Contractor-priced | Contractor-priced | RVU19B |
| 2019-01-01 | Contractor-priced | Contractor-priced | RVU19A |
| 2018-10-01 | Contractor-priced | Contractor-priced | RVU18D |
| 2018-07-01 | Contractor-priced | Contractor-priced | RVU18C |
| 2018-04-01 | Contractor-priced | Contractor-priced | RVU18B |
| 2018-01-01 | Contractor-priced | Contractor-priced | RVU18AR1 |
| 2017-10-01 | Contractor-priced | Contractor-priced | RVU17D |
| 2017-07-01 | Contractor-priced | Contractor-priced | RVU17C |
| 2017-04-01 | Contractor-priced | Contractor-priced | RVU17B |
| 2017-01-01 | Contractor-priced | Contractor-priced | RVU17A |
| 2016-10-01 | Contractor-priced | Contractor-priced | RVU16D |
| 2016-07-01 | Contractor-priced | Contractor-priced | RVU16C |
| 2016-04-01 | Contractor-priced | Contractor-priced | RVU16B |
| 2016-01-01 | Contractor-priced | Contractor-priced | RVU16A |
| 2015-10-01 | Contractor-priced | Contractor-priced | RVU15D |
| 2015-07-01 | Contractor-priced | Contractor-priced | RVU15C |
| 2015-04-01 | Contractor-priced | Contractor-priced | RVU15B |
| 2015-01-01 | Contractor-priced | Contractor-priced | RVU15A |
| 2014-10-01 | Contractor-priced | Contractor-priced | RVU14D |
| 2014-07-01 | Contractor-priced | Contractor-priced | RVU14C |
| 2014-04-01 | Contractor-priced | Contractor-priced | RVU14B |
| 2014-01-01 | Contractor-priced | Contractor-priced | RVU14A |
| 2013-10-01 | Contractor-priced | Contractor-priced | RVU13D |
| 2013-07-01 | Contractor-priced | Contractor-priced | RVU13C |
| 2013-04-01 | Contractor-priced | Contractor-priced | RVU13B |
| 2013-01-01 | Contractor-priced | Contractor-priced | RVU13AR |
Where the Wisconsin rate applies
Wisconsin is a Medicare payment area, not a city. Our Census mapping connects it to 807 cities and communities in Wisconsin. Some span more than one payment area; confirm with the service ZIP.
- Abbotsford
- Abrams
- Adams
- Adell
- Albany
- Algoma
- Allens Grove
- Allenton
R0075 billing questions
When should I report R0075 instead of R0070?
Use R0075 when more than one patient is seen on the portable X-ray trip to the location. R0070 is for a trip when one patient is seen.
Is R0075 reported per patient or per trip?
It is reported per trip to the facility or location, not once for each patient. The multiple-patient code applies when more than one patient is seen on that trip.
Does R0075 include the X-ray interpretation?
No. R0075 is a technical-component-only transport code; a separate code covers interpretation.
How does Medicare price R0075?
It has physician fee schedule status C, so the Medicare Administrative Contractor sets payment for each claim. Special Medicare coverage instructions apply.
Does R0075 describe the portable X-ray examination itself?
No. R0075 describes transportation of the equipment and personnel, not the X-ray examination.
Where these rates come from
FeeBase calculates base physician payments from CMS work, practice-expense and malpractice RVUs, adjusted by each locality’s geographic indexes and the conversion factor. Services without a published rate are labeled, never given a made-up amount. Amounts are Medicare allowed amounts before claim adjustments: not a patient’s bill or a commercial rate.
CMS RVU26D · effective Oct 1, 2026 through the day before Jan 1, 2027
Fee sheets · Coming soon
Put R0075 and the rest of your codes on one sheet
Your codes at your locality, with payer contracts beside Medicare.
Join the waitlist